Ohaji South Flowstation Instrumentation Upgrade
Back to Projects
Category: Instrumentation & Control
Client: Seplat Nigeria Ltd
This project involved a structured instrumentation upgrade to improve monitoring accuracy, system reliability, and operational safety at the Ohaji South Flowstation.
Scope Delivered
- Instrumentation system assessment
- Upgrade of field instruments
- Calibration and loop testing
- Commissioning and validation
- Integration into control architecture
