Ohaji South Flowstation Instrumentation Upgrade

Back to Projects
Category: Instrumentation & Control
Client: Seplat Nigeria Ltd

This project involved a structured instrumentation upgrade to improve monitoring accuracy, system reliability, and operational safety at the Ohaji South Flowstation.

Scope Delivered

  • Instrumentation system assessment
  • Upgrade of field instruments
  • Calibration and loop testing
  • Commissioning and validation
  • Integration into control architecture